Nirbaan

Bottle-Bag-101120

Are you looking for a bag that might be used frequently for carrying wine? What if the bag is eco-friendly? Jute bottle bags can give you a solution. As jute bags are strong enough, you can carry the bottle properly. As jute is strong, it can easily carry the weight of the bottle.

Description

Description

Product Specification:

  • Product Code: NJ-101120
  • Material:Â Fine Jute Fabrics (Natural Laminated)
  • Handle: Jute Handle
  • Imprint:Â Black Color or any Dark Color on Both Side
  • Weight: 240 g
  • External Dimensions: H: 46 x W:42 + G: 16 cm
  • Internal Dimensions: H: 45 x W:40 + G: 14 cm
  • Carton Size:Â 35 x 33 + 58 cm
  • Packing:Â 25/Pcs in poly & 50/Pcs in a paper carton
  • Loading Capacity:

    – 20′ Full Container Loading = 408 – 448 Carton;

    – 40′ Full Container Loading = 840 – 952 Carton;

    – 40′ HQ Full Container Loading = 864 – 1088 Carton;

  • Minimum Order Quantity: 100 Pcs
  • Production Lead Time: 7 – 30 Working Days (Depends on the order volume)

    – After Confirmation of minimum 50% Advance Payment

    – After Approval of Work Order & Artwork (.Ai, .EPS, .PDF)

    – Except for Friday-Saturday and National Holidays in Bangladesh

  • Delivery:Â Shipment will be made after receiving Total Payment
  • Container Loading:Â LCL or FCL on the requirement of Buyer

Purpose of Use:

  • Corporate Branding
  • Special Events Program
  • Seminar, Symposium or Annual General Meetings Gift Packing
  • Reuse and Carry Gifts and Grocery again and again.

Sample Policy:

  • Lead Time:Â Sample Lead time required Usually within 3~7 days
  • Sample Fee:Â We need to charge $250.00 for the samples and shipping fee.
  • Refund Policy: The sample fee will fully return when bulk orders reach a minimum of the 20′ FCL.
  • Free Sample: If you are our old customer, you will get our new jute products for the first time and for free, Only DHL Shipment cost will be payable.

Payment Terms:

  1. Payment:Â Minimum 50% Payment Should be Paid in Advance.
  2. Production Lead Time:  7 – 30 Working days after receiving Advance Payment, Work Order & Artwork (i.e.: Depends on the order volume).
  3. Shipment: Shipment will be made within 5 – 7 days after receiving Rest Payments.
  4. Partial Shipment:Â Part Payments and Partial Shipments are acceptable.
  5. Tolerance:Â Normal Tolerance of +/-5% in Quantity and Weight is acceptable.
  6. SGS Inspection: SGS Inspection Report if required, would be provided at the buyer’s option and cost.
  7. Charges: All charges outside Bangladesh are from Applicant’s accounts.

Similar Product